Lab Renovation vs. Relocation: How to Decide What’s Right for Your Facility

Writer: Devan Mairose Calhoun
Devan Mairose Calhoun
6 days ago
3 min read
laboratory renovation project

Growth, new research programs, aging infrastructure, or changing operational needs can all lead life science organizations to the same question: Should we renovate our existing laboratory or move into a new space?


For Bay Area facilities and real estate teams, there is rarely a one-size-fits-all answer. An existing facility may offer opportunities for modernization and expansion, while a relocation can provide a chance to rethink workflows and infrastructure from the ground up.


The right decision depends on more than available square footage. Cost, schedule, infrastructure, operational continuity, and long-term business plans should all factor into the evaluation.


Here are some of the most important considerations to explore before choosing a path:


1. Start With Your Long-Term Facility Needs


Before comparing construction costs, start by defining what the organization needs the facility to accomplish. You should consider:


  • Is headcount expected to grow?

  • Are research programs or processes changing?

  • Will new equipment require additional utilities or infrastructure?

  • Is more laboratory capacity needed?

  • Could the balance between lab and office space change?

  • How long does the organization expect to occupy the facility?


A renovation that solves an immediate space constraint may not be the best investment if another major expansion will be required shortly afterward. Conversely, relocating solely because the existing facility feels constrained may overlook opportunities to reconfigure or modernize the space more efficiently.


2. Understand What Your Existing Infrastructure Can Support


Laboratory facilities place significant demands on building systems. Before determining whether an existing space can accommodate future needs, evaluate systems such as:


  • HVAC and exhaust

  • Electrical capacity

  • Emergency and backup power

  • Plumbing

  • Process utilities

  • Structural requirements

  • Controls and building systems


An existing laboratory with sufficient infrastructure may provide a strong foundation for renovation. In other situations, the cost and complexity of upgrading those systems may change the equation.


This is where early investigation can be especially valuable. MAI’s Preconstruction Services help project teams evaluate existing conditions, constructability, budget considerations, and potential risks before major decisions are made.


3. Compare More Than Construction Cost


When evaluating renovation versus relocation, it can be tempting to compare the estimated construction cost of each option.


The full financial picture is often more complex.

A renovation may involve:

  • Temporary relocation or swing space

  • Phased construction

  • Off-hours work

  • Infrastructure upgrades

  • Temporary utilities or protections

A relocation may introduce:

  • Lease considerations

  • Moving expenses

  • Equipment relocation and recommissioning

  • New infrastructure requirements

  • Operational transition costs

Evaluating the broader project cost gives decision-makers a more useful comparison than construction cost alone.


4. Consider the Impact on Research and Operations


Operational continuity can be one of the most important factors in the decision.


Renovating an active laboratory may require careful phasing to keep critical research functions operating throughout construction.


Teams should consider:


  • Which spaces must remain operational?

  • Can departments or equipment be temporarily relocated?

  • What utilities are shared between construction and occupied areas?

  • Are there activities that cannot tolerate noise, vibration, or interruptions?

  • What level of downtime is acceptable?


With the right planning, many life science construction projects can be phased around active operations. But those requirements should be understood early because they can influence schedule, budget, and project delivery.


5. Look at Schedule From Both Perspectives


A relocation may appear faster because construction can take place in an unoccupied facility. However, the overall timeline may also include site selection, lease negotiations, design, permitting, construction, commissioning, and the physical move.


Renovations present a different set of schedule considerations, particularly when work must be phased around ongoing operations. Rather than asking which option is inherently faster, facilities teams should develop realistic schedules for both scenarios.


Early construction input can help identify permitting, procurement, phasing, and existing-condition considerations that may not be obvious during initial planning.


6. Evaluate Flexibility for the Future


A laboratory should support more than today's requirements.


Research priorities can change quickly, particularly for growing life science organizations. Facilities that can adapt to new equipment, workflows, staffing levels, and research programs can provide greater long-term value.


When comparing renovation and relocation options, consider how easily each facility can evolve. Sometimes an existing space has more flexibility than initially expected. In other cases, a new facility offers a better opportunity to build adaptability into the project from the beginning.


Use Preconstruction to Compare the Options


The renovation-versus-relocation decision does not need to be based on assumptions.


Bringing construction expertise into the conversation early can help teams compare options using real information about:


  • Existing conditions

  • Infrastructure

  • Constructability

  • Phasing

  • Schedule

  • Procurement

  • Preliminary budgets


For projects where speed and collaboration are particularly important, MAI’s Design-Build Services can also bring design and construction teams together earlier in the process.


Considering Your Next Lab Project?


Whether the best path is renovating your existing laboratory, expanding within your current facility, or preparing a new space, the right decision starts with understanding your operational and long-term goals.


Explore MAI’s Life Science experience and Preconstruction Services, or contact our team to discuss the options for your next Bay Area laboratory project.