top of page
$2.7M
Project Value
3,950 SF
Project Size
Project entailed relocating an existing MDVT Lab used for destructive testing on products including humidity, temperature, altitude, drop, shock and vibration on a design build basis. Included installation of a redundant CDA system, deionized water system, high static exhaust system and extensive electrical upgrades in a 3,950 SF space. MAI was responsible for all aspects ranging from design, moves, and commissioning.
Project Gallery
bottom of page