top of page

Lygos 25821 Industrial Blvd., Hayward Tenant Improvement

MAI was retained by Lygos to build their new 54,000 SF headquarters in Hayward, CA. The project began with extensive pre-construction, planning, and design phase resulting in a fully coordinated BIM design. Construction included converting an existing shell space into 15,000 SF of office space, 35,000 SF of lab space, and a 4,000 SF mechanical yard. Due to the buildings structural constraints a new 5,400 SF above roof equipment platform was required to house all of the new HVAC equipment.

The office area features open-concept and private offices, a lobby, boardroom, breakroom, conference rooms, and restrooms. Lab spaces include analytical, strain engineering, fermentation, downstream processing, glasswash, utility rooms, and a pilot plant area. MAI managed the procurement and installation of the new bioreactors, tanks, and support equipment.

The 4,000 SF mechanical yard will house all of the process equipment, including a new purified
water distribution skid, a new waste neutralization system for lab and aqueous waste, new
CDA equipment, new plant steam and clean steam boiler systems, a new refrigerated glycol
skid, and new custom tanks for LN2, NH4OH, and DE-95.

N/A

Project Value

54,000SF

Project Size

Project Gallery

bottom of page